A company built to deliver one specific project
Azar Mehr Pargas develops, builds and operates renewable energy plants. Its first project is a 3 MW solar plant in the Chaghadak district of Bushehr province.
From land to licence
Iran is among the sunniest countries in the world, and Bushehr province — with more than 300 clear days a year — is one of its best locations for solar generation. The company was founded on that observation: turning sunlit land in the south into real generating capacity.
To date the company has acquired the land, obtained the 3 MW construction licence, produced a technical and financial feasibility study based on PVsyst simulation, and taken the project file to the ready-to-build stage. The next step is an investment partner to fund construction.
| Legal name | Azar Mehr Pargas Co. (Private Joint Stock) |
|---|---|
| Field of activity | Development, construction and operation of renewable energy plants |
| Chairman of the board | Bahman Zanguei Nezhad |
| Head office | Mellat Tower, 4th floor, unit 9, corner of Ansari, Valiasr St. (opposite Mellat Park), Tehran, Iran |
| Phone and fax | +98 21 2635 5634 — Fax: +98 21 2635 6139 |
| Current project | 3 MW solar plant, Chaghadak district, Bushehr province |
| Expansion capacity | Phase two to a combined 7 MW on the remaining land |
| Website | www.ampargas.com |
Project governance
Owner and developer
Azar Mehr Pargas — landowner, licence holder, and responsible for financing, project management and long-term operation.
EPC contractor
A qualified contractor with megawatt-scale solar experience, selected through a limited tender.
Technical adviser and supervisor
An independent consulting engineer for quality control, acceptance testing and handover.
Operations and maintenance
An annual contract with the EPC contractor or a specialist O&M firm, with live generation monitoring.
Energy sales broker
A licensed Iran Energy Exchange broker for offerings on the green power board.
Permanent site team
Operations manager, electrical technician, security and service staff.
How we work
Facts kept apart from estimates
Every figure we publish has a stated basis, and anything that is an estimate is labelled as one.
We carry the administrative load
Licensing, grid connection and dealings with local authorities are our responsibility, not the investor's.
Designed for twenty years
Structures, equipment and maintenance are specified against the asset's design life rather than lowest first cost.
Project team
The executive team and project advisers are being finalised and will be introduced in this section.